PROJECTS
PUBLIC TRANSIT

Phoenix, AZ

1. Valley Metro RPTA - South Central Extension Project

Duties included design consulting (architecture and landscape architecture), design coordination with other teams (engineering and art program), design documents review, and construction administration duties such as RFI responding, submittal review, site visits, and logs.

SCE-Downtown_Washington 3.jpg
SCE-Broadway-Central Ave 3.jpg
SCE-Downtown_Jefferson.jpg
SCE-Pioneer-Central Ave 3.jpg

Phoenix, AZ

2. Valley Metro RPTA - Northwest II Extension Project

Duties included design consulting (architecture and landscape architecture), design coordination with other teams (engineering and art program), design documents review, and construction administration duties such as RFI responding, submittal review, site visits, and logs.

02  Base_Day_Station & I-17.jpg
Valley-Metro-Still01.jpg
Valley-Metro-Still02.jpg
Rose-Mofford_Station 3.jpg
25th-Dunlap_Station 3.jpg

Phoenix, AZ

3. Valley Metro RPTA - Capitol/ I-10 Extension Project

Duties included planning efforts for the best route. The project is to begin the design phase in late 2021.

Phoenix, AZ

4. Valley Metro RPTA - 50th st Station

Duties included design consulting (architecture and landscape architecture), design coordination with other teams (engineering and art program), design documents review, and construction administration duties such as RFI responding, submittal review, site visits, and logs.

50th Street Station - Disability Riders (VMLR) 6-20190093LRR.jpg
50th Street Station - Disability Riders (VMLR) 6-20191016LRR.jpg
50th Street Station - Disability Riders (VMLR) 6-20191174LRR.jpg

Phoenix | Tempe | Mesa, AZ

5. Valley Metro RPTA - Central Phoenix / East Valley

Duties included continuous site visits once built to determine maintenance issues, ADA issues, fixes on concrete surfaces, and emergency gate re-installation. 

2020-06-11 11.17.04.jpg
2019-12-18 08.44.08.jpg
IMG_6452.JPG
IMG_6444.JPG

Tempe, AZ

6. Tempe Streetcar

Duties included design consulting (architecture and landscape architecture), design coordination with other teams (engineering and art program), design documents review, and construction administration duties such as RFI responding, submittal review, site visits, and logs.

Dorsey_Final Track Pour (1).jpg
6th and Mill (1).jpg
IMG_20210107_123646279.jpg
IMG_20201125_153150216_HDR.jpg
TSC BZ Rural 7 Install.jpg

Phoenix, AZ

7. Valley Metro RPTA - Operations and Maintenance Center Expansion project

Duties included design consulting (architecture and landscape architecture), design coordination with other teams (engineering and art program), design documents review, and construction administration duties such as RFI responding, submittal review, site visits, and punch lists logs.

2020-03-26 09.20.00.jpg
2020-01-09 12.27.24.jpg
2020-05-29 10.17.12.jpg
2020-12-08 08.07.50.jpg

Phoenix | Tempe | Mesa, AZ

8. Valley Metro RPTA - Bus Handbook Standards Update

Duties included the update of a 1993 bus standards handbook. Ample research and coordination with other jurisdictions to inquire on their operations and needs. 

Bus System Handbook_Final_Page_01.jpg

Phoenix | Tempe | Mesa, AZ

9. Valley Metro RPTA - Urban Design Guidelines Update

Duties included the update of a 2001 bus guidelines document. In-depth research or best practices and Valley Metro's vision for the new extension projects was done. 

Urban Design Guidelines Draft 2021.04.23_Page_01.jpg

Phoenix | Tempe | Mesa, AZ

10. Valley Metro RPTA - Facilities Handbook Update

Duties included the update of a 1995 facilities document. As Valley Metro grows, there is a need to expand riders' facilities. Some of these smaller projects such as transit centers and park-and-rides are done by the cities. There was a need to update the process to follow for such endeavors. 

Facilities Handbook 2021.08.10 DRAFT_Page_01.jpf

Phoenix | Tempe | Mesa, AZ

11. Valley Metro RPTA - Design Criteria Manual

Duties included the continuous update of Valley Metro's criteria manual. Additions of minimum shade percentages was one of the most strenuous update as it required cost-estimate, benefits to riders, and equity considerations. Other changes included modification of plant material to be chosen for the station platforms and misc operations requests.